TRANSPORTATION > BRIDGE INSPECTIONS

DEL-CR72-8.44 (CHESHIRE ROAD)

DELAWARE COUNTY, OHIO

This project was a Design-Build project with R&I construction performed for the Delaware County Engineers Office. The project involved the replacement of an existing single span pony truss bridge with a 100’ long single span composite  prestressed concrete box beam bridge. The width of the bridge was increased from an existing width of 24’ to a proposed width of 44’. The project involved approximately 500’ of approach work which included widening and resurfacing of the existing pavement.

Project Cost
$800,000